>

Atmos DC0042 Roof, 320 mm Length

Code: DC0042
Not rated Rating details
77,67 € / pcs Measure price:
In stock at supplier

Detailed information

Product detailed description

- for DC18S boilers (manufactured from 2010 to 2018), DC18SP(L), DC22SX, DC15E (from serial no. 310488)
 
Original refractory moulding - Atmos DC0042 roof (new design) - located in the lower chamber of wood gasification boilers, or in the middle chamber of combined three-chamber boilers. The roof must always be pushed fully against the rear wall of the boiler!
  • length: 320 mm

Note:
DC18S boilers manufactured before 2010 and after 2018 have a refractory moulding in the lower chamber - DC0081 ball chamber.

Frequently asked questions

  • How do I choose the right output for a solid-fuel boiler? Base your choice on the calculated heat loss of the heated building; for wood/coal boilers also consider that the boiler burns for several hours at essentially constant output during a single load - which is why it's common practice to add a buffer (accumulation) tank to the boiler, storing surplus heat for later use instead of having to inefficiently throttle the boiler.
  • What else do I need to install this boiler? Besides the boiler itself, the system usually requires: a buffer (accumulation) tank of adequate volume, a circulation pump (often already fitted with a built-in Laddomat or thermoregulatory valve against low-temperature corrosion of the boiler), a safety valve, an expansion vessel, and a flue/chimney with sufficient draught matching the boiler's output - you'll find the exact chimney draught values in the technical parameters above.
  • What fuel is suitable, and what isn't? Use only fuel recommended by the manufacturer for the given model (typically split logs of a defined length and moisture content, or brown-coal briquettes or coal depending on the boiler type) - unsuitable or overly damp fuel reduces efficiency, increases tar and deposit build-up, and can damage the boiler.
  • What about chimney inspection and legislation? Before putting the boiler into operation, and regularly during its use (typically once a year for solid fuels), the chimney must, by law, be inspected/cleaned by an authorised chimney sweep - without the relevant inspection certificate, an insurance claim in the event of a fire may also be disputed.
  • How much maintenance does the boiler require? This usually includes regularly removing ash and cleaning the heating surfaces/flue-gas passages of soot (interval depending on intensity of use, typically on the order of weeks), plus a thorough annual inspection including seals and the chimney.
  • Can I install the boiler myself? The actual placement and connection of the boiler to the heating system, chimney and safety components should be carried out, or at least professionally checked, by a heating technician - this is an appliance with an open flame, high temperatures and pressurised components, where a connection error can be a safety risk.

Additional parameters

Category: Lower chamber roof
Warranty: 2 years
Weight: 9.453 kg
Length: 320mm

Product rating

Be the first who will post an article to this item!

Do not fill out this field:

How would you rate this product? Choose 1 to 5 stars, where 1 is the worst and 5 is the best rating.

Discussion

Do not fill out this field:

List of discussions

P Avatar of author 20/06/2022 08:16
Na kotol Atmos dc 22s potrebujem strechu do splinovacej komory mate takú?
A Avatar of author 20/06/2022 08:18
Dobrý deň, áno môžte ju nájsť tu: https://www.atria.sk/strecha-do-spodnej-komory/
Vytvořil Shoptet | Design Shoptak.cz. > >