Atmos DC0042 Roof, 320 mm Length
Code: DC0042Product detailed description
- for DC18S boilers (manufactured from 2010 to 2018), DC18SP(L), DC22SX, DC15E (from serial no. 310488)
Original refractory moulding - Atmos DC0042 roof (new design) - located in the lower chamber of wood gasification boilers, or in the middle chamber of combined three-chamber boilers. The roof must always be pushed fully against the rear wall of the boiler!
- length: 320 mm
Note:
DC18S boilers manufactured before 2010 and after 2018 have a refractory moulding in the lower chamber - DC0081 ball chamber.
Frequently asked questions
- How do I choose the right output for a solid-fuel boiler? Base your choice on the calculated heat loss of the heated building; for wood/coal boilers also consider that the boiler burns for several hours at essentially constant output during a single load - which is why it's common practice to add a buffer (accumulation) tank to the boiler, storing surplus heat for later use instead of having to inefficiently throttle the boiler.
- What else do I need to install this boiler? Besides the boiler itself, the system usually requires: a buffer (accumulation) tank of adequate volume, a circulation pump (often already fitted with a built-in Laddomat or thermoregulatory valve against low-temperature corrosion of the boiler), a safety valve, an expansion vessel, and a flue/chimney with sufficient draught matching the boiler's output - you'll find the exact chimney draught values in the technical parameters above.
- What fuel is suitable, and what isn't? Use only fuel recommended by the manufacturer for the given model (typically split logs of a defined length and moisture content, or brown-coal briquettes or coal depending on the boiler type) - unsuitable or overly damp fuel reduces efficiency, increases tar and deposit build-up, and can damage the boiler.
- What about chimney inspection and legislation? Before putting the boiler into operation, and regularly during its use (typically once a year for solid fuels), the chimney must, by law, be inspected/cleaned by an authorised chimney sweep - without the relevant inspection certificate, an insurance claim in the event of a fire may also be disputed.
- How much maintenance does the boiler require? This usually includes regularly removing ash and cleaning the heating surfaces/flue-gas passages of soot (interval depending on intensity of use, typically on the order of weeks), plus a thorough annual inspection including seals and the chimney.
- Can I install the boiler myself? The actual placement and connection of the boiler to the heating system, chimney and safety components should be carried out, or at least professionally checked, by a heating technician - this is an appliance with an open flame, high temperatures and pressurised components, where a connection error can be a safety risk.
Additional parameters
| Category: | Lower chamber roof |
|---|---|
| Warranty: | 2 years |
| Weight: | 9.453 kg |
| Length: | 320mm |
Product rating
Be the first who will post an article to this item!
Discussion
List of discussions
P
Peter
Na kotol Atmos dc 22s potrebujem strechu do splinovacej komory mate takú?
A
Atria
Dobrý deň, áno môžte ju nájsť tu: https://www.atria.sk/strecha-do-spodnej-komory/
