DC0081 Ball-shaped Chamber, 4-piece L+R Side + Rear Panel
Code: DC0081Related products
Product detailed description
for Atmos boilers DC18S, DC20GS, DC18SP(L), DC18GD, DC18GSE, DC18GSP, DC22GSE ... see below
Original ceramic ball-shaped chamber Atmos DC0081:
- intended for the lower chamber of Atmos boilers DC18S, DC20GS, DC18GD, DC18GSE, DC22GSE, GS20 and the old version of DC25GSE
- intended for the middle chamber for wood heating in three-chamber combined Atmos boilers DC18SP(L), DC18GSP
- package contents: 1x left side DC0095, 1x right side DC0096, 1x rear panel DC0091
- length: 310mm
Note:
Between the ball-shaped chamber and the gasification nozzle holder there are two sibral strips - ball-shaped chamber seals, which are not included in the delivery and can be ordered here: ball-shaped chamber seal
Frequently Asked Questions
- How do I choose the right output for a solid fuel boiler? Base your choice on the calculated heat loss of the building being heated. However, with wood/coal boilers also consider that the boiler burns for several hours per single load at essentially constant output - it is therefore common practice to add a buffer (accumulation) tank to the boiler, which stores surplus heat for later use instead of forcing the boiler to smoulder inefficiently.
- What else do I need to install this boiler? Besides the boiler itself, the system generally requires: a suitably sized buffer (accumulation) tank, a circulation pump (often already fitted with a Laddomat or thermoregulatory valve to protect the boiler against low-temperature corrosion), a safety valve, an expansion vessel, and a flue/chimney with sufficient draught matching the boiler's output - exact draught values can be found in the technical parameters above.
- What fuel is suitable, and what isn't? Use only fuel recommended by the manufacturer for the given model (typically split wood of a defined length and moisture content, or lignite briquettes or coal depending on the boiler type) - unsuitable or overly damp fuel reduces efficiency, increases tar and deposit build-up, and can damage the boiler.
- What about chimney inspections and legislation? Before commissioning the boiler, and regularly during its use (generally once a year for solid fuels), an inspection/cleaning of the chimney by an authorised chimney sweep is legally required - without the relevant inspection certificate, an insurance claim in the event of a fire may also be disputed.
- How much maintenance does the boiler require? This typically includes regularly removing ash and cleaning the heating surfaces/flue gas passages of soot (the interval depends on how intensively the boiler is used, generally on the order of weeks), plus a thorough annual inspection including seals and the chimney.
- Can I install the boiler myself? The actual placement and connection of the boiler to the heating system, chimney and safety components should be carried out, or at least professionally inspected, by a heating technician - this is equipment involving open flame, high temperatures and pressurised components, where an installation error can be a safety risk.
Additional parameters
| Category: | ball-shaped insert for the lower chamber |
|---|---|
| Warranty: | 2 years |
| Weight: | 26.611 kg |
| Length: | 310mm |
| Obsah balenia: | 1x left side DC0095, 1x right side DC0096, 1x rear panel DC0091 |
Product rating
Be the first who will post an article to this item!
Discussion
Be the first who will post an article to this item!
