Nozzle DC0121
Code: DC0121Product detailed description
- intended for boiler DC18S(before 2019), DC18SP(L), DC18GD, DC20GS, DC22SX, GS20, DC18GSE, DC22GSE, DC25GSE - old design, DC18GSP(L)
Original ceramic nozzle ATMOS DC0121:
- outer dimensions: 390 mm length, 190 mm width
- nozzle opening dimensions: 140 mm length, 34 mm width
- for Atmos boilers: DC18S (manufactured until 31 Dec 2018), DC18SP(L), DC18GD, DC20GS, DC22SX, GS20, DC18GSE, DC22GSE, DC25GSE (old design, manufactured until 15 Apr 2012), DC18GSP(L)
- the package includes sealant and 3 sealing cords for sealing the gasification nozzle on the sides and at the front of the boiler
Note:
For boilers DC25GSE manufactured from 15 Apr 2012 the correct part is nozzle DC0126.
For boilers DC18S manufactured from 1 Jan 2019 the correct part is nozzle DC0149.
Frequently Asked Questions
- How do I choose the right output for a solid fuel boiler? Base your choice on the calculated heat loss of the building being heated. For wood/coal boilers, also keep in mind that the boiler burns for several hours at essentially constant output on a single fill - which is why it's common practice to add a buffer (accumulation) tank to the boiler, storing surplus heat for later use instead of forcing the boiler to run inefficiently throttled down.
- What else do I need to install this boiler? Besides the boiler itself, the system usually requires: a suitably sized buffer (accumulation) tank, a circulation pump (often already fitted with a Laddomat or a thermoregulatory valve to protect the boiler against low-temperature corrosion), a safety valve, an expansion vessel, and a flue/chimney with sufficient draught matching the boiler's output - exact chimney draught values can be found in the technical parameters above.
- What fuel is suitable, and what isn't? Use only fuel recommended by the manufacturer for the given model (typically split logs of a defined length and moisture content, or lignite briquettes or coal depending on the boiler type) - unsuitable or overly damp fuel reduces efficiency, increases tar and deposit build-up, and can damage the boiler.
- What about chimney inspection and legislation? Before putting the boiler into operation, and regularly during its use (usually once a year for solid fuels), the chimney must by law be inspected/cleaned by an authorized chimney sweep - without the relevant inspection certificate, an insurance claim in the event of a fire could also be disputed.
- How much maintenance does the boiler need? This typically includes regularly removing ash and cleaning the heat exchange surfaces/flue gas passages of soot (interval depending on usage intensity, usually a matter of weeks), plus a thorough annual inspection including seals and the chimney.
- Can I install the boiler myself? The positioning and connection of the boiler to the heating system, chimney, and safety components should be carried out, or at least professionally inspected, by a heating technician - this is equipment involving open flame, high temperatures, and pressurized components, where an installation error can pose a safety risk.
Additional parameters
| Category: | gasification nozzles |
|---|---|
| Warranty: | 2 years |
| Weight: | 14.49 kg |
Product rating
Be the first who will post an article to this item!
Discussion
Be the first who will post an article to this item!
