Spherical combustion chamber for the lower chamber of 3-chamber boilers
Code: C0032Related products
Product detailed description
for the lower chamber of Atmos boilers DC18SP, C20S, C25ST, AC35S, C18SP, C25SP, DC15EP, ACxxSP, DC18GSP, KCxxSP, C20
Original ceramic spherical combustion chamber Atmos C0032:
- intended for the lower chamber for pellet firing in three-chamber combi boilers DC18SP, C18SP, C25SP, DC15EP, ACxxSP, DC18GSP, KCxxSP
- intended for the lower chamber of boilers C20S, C25ST, AC35S, C20
- package contents: 1x left side C0056, 1x right side C0057, 1x rear face C0041
- length: 310mm
Note:
For the lower chamber for pellet firing in three-chamber combi boilers DC25SP, DC30SPX, DC32SP, DC25GSP, DC30GSP, the spherical combustion chamber DC0171 is intended
Frequently Asked Questions
- How do I choose the right output for a solid fuel boiler? Base your choice on the calculated heat loss of the heated building; for wood/coal boilers also bear in mind that the boiler burns for several hours at essentially constant output on a single load - it is therefore common practice to add a buffer (accumulation) tank, which stores the surplus heat for later use instead of forcing the boiler to run inefficiently at a reduced output.
- What else do I need to install this boiler? Besides the boiler itself, the system usually requires: a suitably sized buffer (accumulation) tank, a circulation pump (often already fitted with a Laddomat or thermoregulating valve to protect the boiler against low-temperature corrosion), a safety valve, an expansion vessel, and a flue/chimney with sufficient draught matching the boiler's output - exact draught values can be found in the technical parameters above.
- What fuel is suitable, and what isn't? Use only fuel recommended by the manufacturer for the given model (typically split firewood of a defined length and moisture content, or lignite briquettes or coal depending on the boiler type) - unsuitable or overly damp fuel reduces efficiency, increases tar and deposit build-up, and can damage the boiler.
- What about chimney inspection and legislation? Before the boiler is put into operation, and regularly during its use (typically once a year for solid fuels), a chimney inspection/cleaning by an authorised chimney sweep is legally required - without the relevant inspection certificate, an insurance claim in the event of a fire may also be disputed.
- How much maintenance does the boiler require? This typically includes regular removal of ash and cleaning of the heating surfaces/flue gas paths of soot (interval depending on intensity of use, usually a matter of weeks), plus a thorough annual inspection including seals and the chimney.
- Can I install the boiler myself? The actual placement and connection of the boiler to the heating system, chimney and safety elements should be carried out, or at least professionally checked, by a heating technician - this is an appliance with an open flame, high temperatures and pressurised parts, where a wiring/connection error can be a safety risk.
Additional parameters
| Category: | ball-shaped insert for the lower chamber |
|---|---|
| Warranty: | 2 years |
| Weight: | 29.647 kg |
| Length: | 310mm |
| Obsah balenia: | 1x left side C0056, 1x right side C0057, 1x rear panel C0041 |
Product rating
Be the first who will post an article to this item!
Discussion
Be the first who will post an article to this item!
